Melt & pelletizing / NPO Himmash

Vacuum melt degassing

Extraction of gases and moisture vapor from the polymer melt by vacuum.

up to 5 %Moisture vapor
removal from the polymer
0.75–4 kWVacuum pump
power
1.5 m²Floor
space
Price
170,000 RUB
excl. VAT
30 working daysLead time

Indicative price; not a public offer. The exact price is given in a commercial proposal.

An engineer will help confirm suitability and configuration.

01 — Specifications

Technical
specifications

Vacuum melt degassing
Moisture vapor removal from the polymerup to 5%
Vacuum pump power0.75 to 4 kW
Tank volumeup to 50 L
Pipingsteel-plastic, 1–2 inch diameter
Floor space1.5 m²
Weightup to 175 kg
02 — Description

What the
equipment does

The extruder screw feeds the melt into the degassing zone, above which a chamber is located. A vacuum pump evacuates the chamber in a controlled way and removes moisture vapor, gases and colorant decomposition products.

The result is a high-quality finished product: no moisture droplets or delamination, and better physical and mechanical properties in tensile and break tests.

03 — How it works

Vacuum pulls
the moisture out

An interactive drawing based on the photos, specifications and open sources. A vacuum chamber sits over the degassing zone of the screw: the pump evacuates it, and moisture vapour leaves the melt for the tank.

  • Vacuum chamber over the degassing zone: the vapour from the melt goes here
  • Condensate tank and vacuum pump: up to 5 % moisture vapour removed, pump 0.75–4 kW
Loading the drawing…
The screw carries the melt into the degassing zone under the barrel vent. The pump evacuates the chamber over the vent; vapour bubbles rise and burst, and moisture vapour, gases and colorant decomposition products leave through the valve and the gauge tee for the tank, where the condensate collects. Without vacuum the bubbles travel on with the melt, leaving moisture droplets and delamination in the pellets. The barrel and the chamber are shown in section; motion is slowed down, condensate build-up is sped up.
04 — Terms of supply

Everything in order
before start-up.

30 days

Working days: lead time.

70 / 30%

70% prepayment, 30% after manufacture.

6 months

Warranty from shipment.

Delivery

By freight carrier.

Let’s start with your project

What feedstock
do you want to recycle?

Tell us about your material, volumes and site. Together we will work out where to start.

Call us+7 961 405-35-58Email usggg13@yandex.ru

or send a request and an engineer will call you back

Vacuum degassing170,000 RUB · excl. VAT
CallEmail
Request to an engineer

Let’s discuss
your project.

An engineer will contact you within one business day, clarify the details and prepare a quotation for your feedstock and volume.

Subject

Or contact us directly

+7 961 405-35-58ggg13@yandex.ruMon–Sat, 09:00–17:00 (Moscow time)
What you need
up to 3 files, 10 MB each

* Required fields. We only use your details to reply to your request. Privacy policy