Closed-loop treatment system for industrial wastewater: water is returned to the production cycle up to 20 times.

3–10 m³/hCapacity
20 ×Water returned
to the cycle
35 m²Floor
space
Price
Based on your requirements
up to 60 working daysLead time

An engineer will help confirm suitability and configuration.

01 — Specifications

Technical
specifications

T-5000 wastewater treatment system
Capacity3–10 m³/h
Installed electrical powerup to 10 kW
Power supply380 V
Operating staff1 person
Floor space35 m²
Heightup to 2,500 mm
Dry weightup to 5,000 kg
02 — Description

What the
equipment does

A local system for wastewater treatment and water recycling at your plant. It is installed inside the shop or as a separate container unit and operates at air temperatures from +5 to +45 °C.

Treatment uses intensive methods (electroflotation, electrocoagulation, electrolysis, electrodialysis, sorption and mechanical filtration), so the system also suits small production sites. There are two treatment stages: one for water recycling and one for discharge to the sewer.

Besides plastics recycling, the system is used at dairy, meat and fish processing plants, poultry farms, electroplating shops, and washing facilities for road vehicles and railcars.

Treatment performance: inlet → after treatment

  • Suspended solids: up to 50,000 → less than 300 mg/L
  • Fats, petroleum products, oils: up to 5,000 → less than 0.1 mg/L
  • Organic matter: up to 5,000 → less than 300 mg/L
  • Surfactants: up to 3,000 → less than 0.5 mg/L
  • Sand, heavy metal oxides: up to 10,000 → 0.1–5.0 mg/L (zinc)
  • Nanoplastics: up to 10,000 → less than 100 mg/L
  • COD: up to 20,000 → 30–150 mg/L
03 — How it works

Five stages
of a closed loop

An interactive drawing based on the photos, specifications and open sources. Wastewater from the washing line passes five treatment stages in a container unit, and clean water goes back into the loop.

  • The treatment stage selected now
  • Dashes in the pipes run with the flow and get clearer stage by stage
Loading the drawing…
The wastewater first passes a screen that lifts coarse debris into a bin, and is equalised in the intake tank. In the electroflotation tank, gas from the electrodes carries oils and flocs up into a froth; the scraper pushes it into a trough, and the flotation sludge collects in a separate tote. The filters retain metals, organics, nanoplastics and surfactants; the water then gets bactericidal treatment and leaves the clean water tank either back to the line or to the sewer. The drawing is schematic: flow and sludge build-up are sped up.
04 — Terms of supply

Everything in order
before start-up.

60 days

Working days: maximum lead time.

Start-up

Setup of the line is included in the contract price.

70 / 30%

70% prepayment, 30% after manufacture.

6 months

Operating warranty period.

Delivery

By freight carrier or pickup from the factory.

Let’s start with your project

What feedstock
do you want to recycle?

Tell us about your material, volumes and site. Together we will work out where to start.

Call us+7 961 405-35-58Email usggg13@yandex.ru

or send a request and an engineer will call you back

T-5000 water treatmentBased on your requirements
CallEmail
Request to an engineer

Let’s discuss
your project.

An engineer will contact you within one business day, clarify the details and prepare a quotation for your feedstock and volume.

Subject

Or contact us directly

+7 961 405-35-58ggg13@yandex.ruMon–Sat, 09:00–17:00 (Moscow time)
What you need
up to 3 files, 10 MB each

* Required fields. We only use your details to reply to your request. Privacy policy